---
title: "Edit drill site"
slug: bohrplatz-bearbeiten
legacy:
  type: help
  code: UPZKRF
links:
  related:
    - D35K74
    - ALL95X
  glossary:
    - 9EER3Z
    - 6NNCAD
    - QKB6YJ
lang: en
source:
  origin_lang: de
  origin_file: 02_product/de/help/UPZKRF_bohrplatz-bearbeiten.md
  origin_hash:
    algorithm: sha256
    value: 6BACE537BBC8EDCFD44BAB3D469DAB4EB29C36FCA83E2B364A497665210145A4
translation:
  target_lang: en
  generated_at: "2026-07-15T12:01:20.386485879Z"
---


# Edit drill site

![Country selection for the drilling site address](/assets/img/screenshots/de_country_picker.png)
![Example drill site with master data and address](/assets/img/screenshots/de_drillsite_demo01_part01.png)
![Example drill site with contractor and documentselection](/assets/img/screenshots/de_drillsite_demo01_part02.png)
![Example of drill site with a drilling list](/assets/img/screenshots/de_drillsite_demo01_part03.png)

In the **“Edit drill site”** view, you maintain the common master data for a drilling site. This information forms the technical framework for all associated boreholes and is reused in overviews and in generated documents.

In particular, you enter the following here:

- **Name and description** for unique identification in lists and selection dialogues
- **Site number** as an additional internal or external reference
- **Address** of the drilling site as a legible location detail for documents
- **client** containing the details of the person or organisation commissioning the work
- **contractor** containing the contact details of the contractor

A drill site describes the shared construction site. The individual technical details of a specific borehole – such as coordinates, borehole sections or strata – are not maintained here, but within the respective borehole record.

In the lower section, you will see the list of associated boreholes. There, you can:

- create new boreholes
- duplicate existing boreholes
- delete boreholes that are no longer required

Guidelines for maintaining the drilling site:

- Use descriptions that clearly identify the project, location or contract.
- Maintain client and contractor exactly as they are to appear in documents.
- Enter the address in such a way that it can be used as a clear description of the location.
- Then add the individual drill holes if the data differs for each borehole.

If you wish to create a new drill site, please read the help text **Create a new drill site**. For the data relating to an individual borehole, the next step is the help text **Borehole master data**.
